Pump Capacity : Ф900mm x 120cmm x 4.5mH x 2ea
Contract Period : 2013. 03. 13 ~ 05. 30
Location : Cheonwang-dong, Guro-gu, Seoul, Korea
Factory acceptance test is performed at our factory in Hwasun.
Pump performance test is performed for FAT at manufacturer's test shop.
specification.
Heavy crane is about to lift the pump gate for the installation at the concrete structure.
Actuator is installed at the top of the concrete structure platform.
The top is roofed with a transparent blue round canopy from aesthetic standpoint considering
the site location by the apartment complex.
The front view shows the local control panel/ actuator/ canopy at the top, the spindles to
connect the actuator to pump gate in the middle and pump gate/ hand rail for the safety
at the bottom.