2017년 2월 1일 수요일

HASUH Pump Gate®, completed in Pyeongtaek-si, Gyeonggi-do, Korea

Project               : Osung  Pump Station
Pump Capacity  : Ф500mm x 35cmm x 4.5mH x 1ea
Contract Period : 2011. 04. 04 ~ 09. 30
Location            : Anwha, Osung-myeon, Pyeongtaek-si, Gyeonggi-do, Korea

                                  Guide frame is erected at the early stage of construction.


                                 Concrete structure is provided for the equipment installation.


                           The view shows side beam at the right and upper beam in the middle.
 
 
                              Pump is lifted in order to be submerged in the test sump for FAT.
 
 
                                           Pump gate is erected in the concrete structure.
 
 
                                            Actuator is lifted for the erection at the site.
 
 
                         The back side of the pump gate facilities shows the local control panel
                          and the actuator at the top.
 
 