HASUH Pump Gate®, completed in Yangsan-si, Gyeongnam-do, Korea

Project               : Yusan Industrial Complex Pump Station
Pump Capacity  :  Ф1,350mm x 240cmm x 3mH x 2ea
Contract Period : 2011. 02. 22 ~ 06. 30
Location            : 187-4 Yusan-dong, Yangsan-si, Gyeongnam-do, Korea

                                 Civil work starts as the first stage of construction at the site.


                                             Upper beam is erected as part of guide frame.


                     Bottom beam, side beam and upper beam are installed to form a guide frame.


                             Forming work is made for concrete structure by Civil Contractor.


                              Clean concrete structure waits for the installation of pump gate.


                                       Factory Acceptance Test is performed at the factory.


                             Crane is expanding its boom to get the roller gate fitted in the side
                               beam of the guide frame.


                                     Pump is mounted on the flange of the roller gate.


                                 Flap valve is mounted on the outlet of the submersible pump.


                                Self descendable actuator is erected at the top of the structure.


                                  The above shows the front view of the pump gate system.