Pump Capacity : Ф600mm x 45cmm x 3.7mH x 2ea
Contract Period : 2006. 11. 08 ~ 2007. 11. 19
Location : Sora-myeon, Yeosu-city, Jeonnam-do, Korea
Pump gate site is just next to Duckyang Railroad Station in the rural area.
Civil work starts with the sheet piles installed to prevent landslide.
Bottom beam of guide frame is positioned at its designed location keeping
the horizontality and perpendicularity with accurate leveling survey.
Construction stage is in the process of rebar work for concrete floor and wall.
Side beams and upper beams for guide frame are erected on the bottom beams.
Rotary screen is installed at the inlet of pump gate for safe pump operation.
Pump gate is lowered for the installation.
Actuator is lowered at the top of the structure.
Local control panel is positioned at its location.
Flap gate is installed at the downstream of pump gate in order to prevent
seawater from flowing back at high tide.
The front view shows the two sets of pump gate & actuator.
The rear view shows flap gates.