HASUH Pump Gate®, completed in Chogang, Yeongdong-gun, Korea

Project               : Chogang Pump Gate Project
Gate Size           : B2.0m x H2.0m x 2ea
Flow Rate          : 150.6 cmm
Contract Period : 2015. 05. 04 ~ 12. 31
Location            : Simcheon-myeon, Yeongdong-gun, Choongbuk-do, Korea

              The side view shows actuators and local control panels at the upper platform. The
               budget was much saved by the effective utilization of the existing access bridge
               and structures for gate / guide frame.



    Equipments are being installed on the platform off the road by extending the boom
                   of the crane.
 
 
  Actuators and local control panel are installed at the upper platform.



    Two spindles are vertically connected between gate and actuator at the top for 
                      lifting operation. Two units of HPG-800A type are applied for the project.