Project : Gyuam Hinge Pump Station
Pump Capacity : Ф500mm x 39.6cmm x 4.5mH x 3ea
Contract Period : 2012. 03. 29 ~ 06. 15
Location : Oe-ri, Gyuam-myeon, Buyeo-gun, Choongnam-do, Koera
Civil work is performed as the first stage of the construction.
Guide frame is installed at the first stage of the installation.
Gate is installed. Three holes are shown for the mounting of three pumps.
Pumps are installed on the gate.
Hydraulic power unit and local control panel are positioned on the platform.
Hydraulic cylinders are connected between the bracket and the anchored point.
The hydraulic actuator is opening the pump gate after the installation
is completed at the site. It is rare to experience the mounting of three
pumps on a gate.