Project               : Yangjeon Pump Gate Project
Pump Capacity  : Ф 500mm x 34.5cmm x 2.5mH x 4ea
Contract Period : 2015. 12. 14 ~ 2016. 12. 30
Location            : Seonghwan-eup, Seobuk-gu, Cheonan-city, Choongnam-do, Korea

                                 Guide frame is installed at the early stage with civil work.


                                    Concrete is poured for the structure as civil work.


                         Inspection for flap valve is performed by Local Authority at the factory.


                                       Pump performance test is made at the factory.


                           Actuator is installed at the test bench for a lifting test at the factory.


                                        Two sets of HPG-500B type are installed at the site.