Project               : Gadeok Pump Station
Pump Capacity  : Ф1,200mm x 220cmm x 3.8mH x 2ea
Contract Period : 2011. 12. 19 ~ 2012. 04. 30
Location            : Gadeok, Geumseong, Hadong-gun, Gyeonam-do, Korea

                                  Guide frame is installed to the existing concrete structure.


                                Concrete forming work is performed for the main equipments.

          
                                 Crane is lifting the roller gate for the installation at the site.


                                        Pump is mounted on the flange of the roller gate.


                                                         Actuator is installed at the top.


                                      Actuator for screen is tested for lifting the screen.


                           The front view shows the actuators / local control panel at the top, the
                            actuator for the screen in the center and the screen at the bottom.
                    