HASUH Pump Gate®, completed in Suwon, Gyeonggi-do, Korea

Project               : Suwon 3 Industrial Complex Pump Station
Pump Capacity  : Ф1,200 x 1,350mm x 250cmm x 2.65mH x 2ea
Contract Period : 2013. 06. 05 ~ 09. 30
Location            : Gosaek-dong, Gwonseon-gu, Suwon-si, Gyeonggi-do, Korea

                                    Pump is in the process of manufacturing at the factory.


                                       Factory Acceptance Test is performed at the factory.


                                                Actuator is installed at the test bench.


                        Weight is lifted by the actuator at test bench to show the loading capacity.


                                      Actuator is installed at the top of the structure.


                                          Local control panel is installed on the platform.


                       Installation of the major equipments such as pump, gate, actuator, and local
                        control panel is completed at the site.


                          The view shows the actuator at the top and the lifted pump gates in the
                            middle.