Project : Kartika Plaza Pump Gate Project
Pump Capacity : Ф 800mm x 90cmm x 3.3mH x 2ea
Contract Period : 2013. 04. 25 ~ 10.30
Location : Kartika Plaza, Bali Province, Indonesia
This village has suffered from the flooding every year for a long time. Site survey was
made to propose our solution to the flooding. The site had not enough space for pump
gate. Moreover, Hindu Temple at the right was the very sensitive place which requires
the highest attention in order to allow the access at any time and guarantee no damage
during the construction. Consequently, our proposal to use the space under the road for
the pump gate facility installation was accepted. The plan requires the excavation of the
road to make a space for the facilities and the covering over the facilities in order to allow
the vehicles to pass on.
Factory Acceptace Test was made in the presence of Local Authority and
Consultant at our factory in Hwasun, Chollanamdo, Korea.
All the equipments were packed for the export shipping after the completion
of FAT.
A space is provided for the major pump gate facilities under the road by Civil
Contractor.
Pump is being lifted for the mounting on the gate.
Many people came to watch the construction from the village with the curiosity.
Hydraulic cylinder was connected to the gate in order to enable the pump gate
to open or close for the gravity flow or the forcible discharge of the inside water.
Pump discharge operation is performed during the pre-commissioning.
Local Authority visited the site for the inspection just before the final cover
would be put over the space for the pump gate to make a road.
Vehicles pass on the road which was made after the open space over the pump
gate facility was closed with the concrete covers.
Housing which contains local control panel and hydraulic actuator are seen
at the left.
The view from the opposite side shows the Hindu Temple at the left and the
water outlet to the river under the housing for the control panel at the center.