Pump Capacity : Ф1,200mm x 190cmm x 3mH x 2ea, Ф900mm x 100cmm x 3mH x 1ea
Contract Period : 2013. 02. 26 ~ 07. 16
Location : Mangje-dong, Jeongeup-si, Jeollabuk-do, Korea
Civil work starts at the site as the first stage of the construction.
Three sets of guide frame are installed.
Factory Acceptance Test is performed at the factory.
Actuator is installed at test bench to show the capability.
Concrete curing for the major equipments are completed.
The outlet of waterway towards the outside river is shown.
Spindle is connected after the installation of pump gate.
Screen to filter the debris is installed at the inlet of the pump gate.
Actuator and local control panel are installed at the top of the structure.
Rotary screens are seen at the front and actuator / local control panel
are shown at the top.