Project : Seongnam PT Facility Pump Gate
Pump Capacity : Ф1,000mm x 116cmm x 3mH x 4ea
Contract Period : 2013. 06. 26 ~ 12. 30
Location : Bokjeong-dong, Seongnam-si, Gyeonggi-do, Korea
Bottom beam is positioned at its location as the first stage of installation.
Side beam and upper beam are installed for the guide frame.
Gate roller fabrication is completed at the factory.
Concrete form work for main structure is in full swing at the site.
Pump is mounted on the flange of the gate roller.
Actuator is installed at the top of the structure.
Detail explanation is provided for the operators during the training.
The final pump gate facility is shining against the blue sky.