Pump Capacity : Ф 900mm x 120cmm x 4.5mH x 2ea
Contract Period : 2013. 03. 13 ~ 06.25
Location : Cheonwang-dong, Guro-gu, Seoul, Korea
Factory Acceptance Test is performed at our factory at Hwasun.
Pump performance test is performed for FAT.
Actuator is installed at test bench for FAT.
Crane is about to lift the pump gate for the installation at the site.
Actuator is installed at the top of the structure platform.
The top is roofed with a transparent blue round canopy from aesthetic standpoint
considering the site location at the apartment complex.
The front view shows the local control panel/actuator /canopy at the top, the spindles to connect actuator and pump gate in the middle and pump
gate / hand rail at the bottom.