HASUH Pump Gate®, completed in Guro-gu, Seoul, Korea

Project               : Cheonwang Pump Station
Pump Capacity  :  Ф 900mm x 120cmm x 4.5mH x 2ea
Contract Period : 2013. 03. 13 ~ 06.25
Location            : Cheonwang-dong, Guro-gu, Seoul, Korea

                              Factory Acceptance Test is performed at our factory at Hwasun.


                                              Pump performance test is performed for FAT.


                                              Actuator is installed at test bench for FAT.



                              Crane is about to lift the pump gate for the installation at the site.


                         
Actuator is installed at the top of the structure platform.
 
 
 
                  The top is roofed with a transparent blue round canopy from aesthetic standpoint
                   considering the site location at the apartment complex.
 
 

                     The front view shows the local control panel/actuator /canopy at the top,
                      the spindles to connect actuator and pump gate in the middle and pump
                      gate / hand rail at the bottom.                